Creation steps

1.Visit of installation

2. Measurements

The plans of the building as well as the certificate of location are often necessary at this stage.

3. Project presentation

Presentation of the project using a software simulating the shading points at different times of the day.

4. Choice of sail color

Cream

Yellow

Sand

Navy

Blue

Black

Pink

Green

Dark red

Purple

Charcoal

Lime green

Terracotta

Orange

5. Land preparation and installation of anchors and concrete pouring for installation of post

This stage is carried out by a RBQ construction contractor.

It takes 2 days to install the poles. Then we take the last measurement before confection. The sail can be install about 10 days later.